Define the project
Write down the intended use, approximate size, ownership goal, comfort priorities, design direction, budget context, and timing.
Planning guide
Use this guide to organize the site, team, enclosure, services, logistics, and verification plan.

Project checklist
The order can change, but none of these conversations should be left to chance.
Write down the intended use, approximate size, ownership goal, comfort priorities, design direction, budget context, and timing.
Review zoning, access, utilities, drainage, soils, easements, setbacks, surveys, and permit requirements.
Identify architecture, structural engineering, mechanical design, panel manufacturing, construction, and inspection responsibilities.
Connect water, air, heat, and vapor control through walls, roofs, foundations, openings, and penetrations.
Locate electrical chases, plumbing routes, ducts, equipment, ventilation, and service access before manufacturing.
Confirm foundation tolerances, storage, lifting, weather protection, crew readiness, sequence, and field checks.
Keep current drawings, responsibilities, approvals, substitutions, tests, and unresolved items visible to the team.
Start a project
Share what is known, what is undecided, and where the project needs direction.
Share your project